annotate artifacts/doc/mapserver/dbconnection.include @ 7691:fa4fbd66e752

(issue1579) Fix axes syncronisation at Gauges The SyncNumberAxis was completely broken. It only synced in one direction and even that did not work correctly when data was added to the axis (and the syncAxis rescaled but forgot the old axis) then there were lots of ways to bypass that scaling. And i also think the trans calculation was wrong. It has been replaced by a "mostly" simple method to just keep the W in M and W in CM+Datum axes in sync. I say "Mostly" because it had to deal with the Bounds interface.
author Andre Heinecke <aheinecke@intevation.de>
date Fri, 13 Dec 2013 19:03:00 +0100
parents 5aa05a7a34b7
children
rev   line source
1182
8ad0331e444f Added inital mapserver configuration files.
Bjoern Schilberg <bjoern@intevation.de>
parents:
diff changeset
1 CONNECTIONTYPE postgis
8ad0331e444f Added inital mapserver configuration files.
Bjoern Schilberg <bjoern@intevation.de>
parents:
diff changeset
2 CONNECTION "dbname='flys3' host=127.0.0.1 port=5432 user='flys' password='flys' sslmode=disable"

http://dive4elements.wald.intevation.org