view backend/README @ 7691:fa4fbd66e752

(issue1579) Fix axes syncronisation at Gauges The SyncNumberAxis was completely broken. It only synced in one direction and even that did not work correctly when data was added to the axis (and the syncAxis rescaled but forgot the old axis) then there were lots of ways to bypass that scaling. And i also think the trans calculation was wrong. It has been replaced by a "mostly" simple method to just keep the W in M and W in CM+Datum axes in sync. I say "Mostly" because it had to deal with the Bounds interface.
author Andre Heinecke <aheinecke@intevation.de>
date Fri, 13 Dec 2013 19:03:00 +0100
parents 5aa05a7a34b7
children
line wrap: on
line source
For the artifact database
# su - postgres
$ createuser --no-createrole --no-superuser --pwprompt --no-createdb artifacts
$ createdb --encoding=UTF-8 --owner artifacts artifactsdb

For the flys database

# su - postgres
$ createuser --no-createrole --no-superuser --pwprompt --no-createdb flys
$ createdb --encoding=UTF-8 --owner flys flystest1


Build an importer package:
mvn -f pom.xml clean compile assembly:single
Alternatively with oracle:
mvn -f pom-oracle.xml clean compile assembly:single

Standalone DateGuesser testing example:

mvn -e -Dexec.mainClass=de.intevation.flys.utils.DateGuesser -Dexec.args="110803" exec:java <<EOF
110803
EOF

Some importer allow standalone usage:
mvn -e -Dexec.mainClass=de.intevation.flys.importer.parsers.AtFileParser -Dexec.args=/home/felix/.bashrc exec:java

http://dive4elements.wald.intevation.org