view backend/doc/documentation/de/title.tex @ 7691:fa4fbd66e752

(issue1579) Fix axes syncronisation at Gauges The SyncNumberAxis was completely broken. It only synced in one direction and even that did not work correctly when data was added to the axis (and the syncAxis rescaled but forgot the old axis) then there were lots of ways to bypass that scaling. And i also think the trans calculation was wrong. It has been replaced by a "mostly" simple method to just keep the W in M and W in CM+Datum axes in sync. I say "Mostly" because it had to deal with the Bounds interface.
author Andre Heinecke <aheinecke@intevation.de>
date Fri, 13 Dec 2013 19:03:00 +0100
parents e41059fb4073
children 82df5fe118f0
line wrap: on
line source
%-----------------------------------
% TITLE PAGE

\begin{figure}[ht]
  \begin{minipage}[b]{0.5\linewidth}
    \centering
     \includegraphics[scale=0.75]{figures/bfg_logo} \\
     {\tt http://www.bafg.de}\\[4.0cm]
  \end{minipage}
  \begin{minipage}[b]{0.5\linewidth}
    \centering
    \includegraphics[width=0.75\textwidth]{figures/intevation-logo}
     {\tt http://intevation.de/geospatial}\\[2.0cm]
  \end{minipage}
\end{figure}

 \vspace{4cm}
 
 {
 	\sffamily\large
 	Dokumentation Datenimport FLYS, BfG
 
 	\vspace{1cm}
 	{
 		\bfseries\huge
 		Installation, Konfiguration, Betrieb
 	}
 
 	\vspace{1cm}
 	Version \documentversion

    Datum: \documentdate
 
 	Revision: \documentrevision
 }
 
 \vspace{4cm}
 
 \thispagestyle{empty}
 
 \vfill
 
 \begin{flushleft}
 {\bf Authors}:\\
 Ingo Weinzierl$<$ingo.weinzierl@intevation.de$>$\\
 Sascha Teichmann $<$sascha.teichmann@intevation.de$>$\\
 Tom Gottfried $<$tom.gottfried@intevation.de$>$\\
 {\bf Intevation GmbH},\\
 Neuer Graben 17, 49074 Osnabr�ck, Germany\\
 Tel: ++49 541 33 50 83 - 0 \\
 \url{http://www.intevation.net/geospatial}
 
 \end{flushleft}

http://dive4elements.wald.intevation.org