view contrib/init.d/README.txt @ 7691:fa4fbd66e752

(issue1579) Fix axes syncronisation at Gauges The SyncNumberAxis was completely broken. It only synced in one direction and even that did not work correctly when data was added to the axis (and the syncAxis rescaled but forgot the old axis) then there were lots of ways to bypass that scaling. And i also think the trans calculation was wrong. It has been replaced by a "mostly" simple method to just keep the W in M and W in CM+Datum axes in sync. I say "Mostly" because it had to deal with the Bounds interface.
author Andre Heinecke <aheinecke@intevation.de>
date Fri, 13 Dec 2013 19:03:00 +0100
parents dc0cc18e7944
children 1709c429818a
line wrap: on
line source
SLES-Init-Script fuer Dive4Elements River:

Installation als root:
- Kopieren nach /etc/init.d/d4e-river
- chmod 755 /etc/init.d/d4e-river
- insserv /etc/init.d/d4e-river
- /etc/init.d/d4e-river start

Deinstallation als root:
- /etc/init.d/d4e-river stop
- insserv -r /etc/init.d/d4e-river
- rm /var/log/d4e-river.log /var/run/d4e-river.pid /etc/init.d/d4e-river

TODO:
- ggf. logrotate fuer Logdatei /var/log/d4e-river.log konfigurieren

http://dive4elements.wald.intevation.org