Wed, 15 Oct 2014 19:20:26 +0200 |
Tom Gottfried |
SCHEMA CHANGE: removed superfluous columns station and river_id from measurement_stations and adapted other components accordingly.
|
Thu, 11 Sep 2014 16:12:39 +0200 |
Tom Gottfried |
Measurement stations without range should not be used in calculation and we assume the beginning of the range is the station.
|
Mon, 08 Sep 2014 19:00:30 +0200 |
Andre Heinecke |
(issue1448) Unify SedimentLoadData ctor again
|
Mon, 08 Sep 2014 12:21:32 +0200 |
Tom Gottfried |
Fetch missing values from database and show them in diagrams.
|
Fri, 05 Sep 2014 15:09:44 +0200 |
Andre Heinecke |
(issue1448) Use left join to permit loads with empty sq_time intervals to be handled.
|
Fri, 05 Sep 2014 12:22:42 +0200 |
Andre Heinecke |
(issue1448) Add sq time intervals to sediment load data model.
|
Thu, 04 Sep 2014 17:33:01 +0200 |
Tom Gottfried |
Sum up fractions from stations and previous stations according to respective validity model.
|
Fri, 15 Aug 2014 18:25:43 +0200 |
Andre Heinecke |
Fix ti_stop_time naming
|
Fri, 15 Aug 2014 18:01:06 +0200 |
Sascha L. Teichmann |
Use list() instead of iterator(). Why does this not work?
|
Fri, 18 Jul 2014 17:43:27 +0200 |
Sascha L. Teichmann |
Sediment load: Fetch kind of sediment load from database to tell if it is official or not.
|
Fri, 18 Jul 2014 13:03:28 +0200 |
Sascha L. Teichmann |
Sediment load. More off year based calculations.
|
Thu, 17 Jul 2014 11:19:59 +0200 |
Sascha L. Teichmann |
Sediment load: Added join to fetch measurement station via ranges which know the river. Added a visitor for values, too.
|
Wed, 16 Jul 2014 15:53:11 +0200 |
Sascha L. Teichmann |
Use GF_UNKNOWN constant instead of -1 to identify unknown grain fractions.
|
Tue, 15 Jul 2014 18:52:22 +0200 |
Sascha L. Teichmann |
Wire the neighbors to the measurement stations together. This eases the lookup for same types (suspended or bed load).
|
Tue, 15 Jul 2014 12:47:52 +0200 |
Sascha L. Teichmann |
New way to loaded sediment loads from database and cache it. The data structure a way more straight forward. TODO: Implement calculation on this basis.
|