Mercurial > getan
view ChangeLog @ 33:f96a18c10836
Made getan python-2.4 compatible.
author | Ingo Weinzierl <ingo.weinzierl@intevation.de> |
---|---|
date | Tue, 31 Aug 2010 19:37:37 +0200 |
parents | 4de86feae6ac |
children | a9f2e8fd8970 |
line wrap: on
line source
2010-08-31 Ingo Weinzierl <ingo.weinzierl@intevation.de> * getan.py, getan/backend.py: Made getan Python-2.4 compatible. 2010-08-31 Ingo Weinzierl <ingo.weinzierl@intevation.de> * contrib/wochenbericht: Added a parameter 'year' that makes possible to filter out the week of a specific year only. 2010-08-31 Ingo Weinzierl <ingo.weinzierl@intevation.de> ISSUE1566 * getan.py: Bugfix: removed 'with' statement, replaced by try/finally. 2010-08-30 Ingo Weinzierl <ingo.weinzierl@intevation.de> * getan.py: Added __enter__ and __exit__ methods. The exit method is used to stop still running projects - even if getan crashes. Therefor it was necessary to change the method signature of stop_project() in GetanController. The description for the running project is given into the method as parameter. If no desc parameter is specified, '-no description-' is used as description. This is the case if there are still running projects when we reach __exit__(). * getan/states.py: Added a description when calling stop_project() of GetanController. 2010-08-30 Ingo Weinzierl <ingo.weinzierl@intevation.de> * getan/view.py: Bugfix: Unified parameter names in ProjectList - some changes in rev25 did not fit to the current parameter names (head, foot). 2010-08-30 Ingo Weinzierl <ingo.weinzierl@intevation.de> * getan/states.py, getan/view.py: Bugfix: fixed wrong parameter name while accessing the raw project of a project node. 2010-08-29 Ingo Weinzierl <ingo_weinzierl@web.de> * getan.py: Catch a window resize event before calling keypress() of the states and trigger an update of the view - the view is resizable now! 2010-08-29 Ingo Weinzierl <ingo_weinzierl@web.de> * getan/states.py: Enter MoveEntryState and DeleteEntryState only if there are selected entries. * getan/view.py: Updating the footer text of a ListWidget will update the attribute 'footer' in the ListWidget and call ListWidget._update_view(). * getan.py: Bugfix: changed the attribute name (entry -> item) when accessing the EntryList's entries. 2010-08-29 Ingo Weinzierl <ingo_weinzierl@web.de> * getan/view.py: Bugfix: switching the time mode in ProjectList will also update the displayed total time in the footer of ProjectList. 2010-08-28 Ingo Weinzierl <ingo.weinzierl@intevation.de> This commit introduces a new implementation of 'getan's user interface based on urwid ( >= 0.9.9.1). * getan.py: The 'getan' controller that is also used to start the application. * classic/getan: Moved the 'old' getan to this folder - there is a new implementation based on python urwid library. * getan/__init__.py, getan/backend.py, getan/config.py, getan/project.py, getan/states.py, getan/utils.py, getan/view.py: Model, backend, view and config modules used by getan. * README: Added urwid >= 0.9.9.1 as further dependendy of getan and a hint of the classic version of 'getan' based on curses. * TODO: Idea of implementing a 'Help-Widget' to display all available keys. * INTRODUCTION: An overview about possible keys in the user interface. 2009-08-18 Thomas Arendsen Hein <thomas@intevation.de> * contrib/zeiterfassung: left justify user sign in zeiterfassung * getan: human_seconds: Use timespec instead of seconds and document it. * getan: allow adding/subtracting times while a project is running * getan: rename substract to subtract (substract might be correct, too, but outdated) * getan: Allow <timespec>+ and <timespec>- (RPN) to change time for the current project * getan: Handle empty input when adding/subtracting time of the running project 2008-09-09 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeitsort: New. Sorts a zeiterfassung.txt file by the dates in the lines. Useful to merge larger chunks by simply append them and sort the result afterwards. 2008-08-12 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: When assiging a name to an anonym task remove and re-insert it into the project tree to make it selectable. 2008-08-12 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeiterfassung: Applied Stephan Holl's week-option.patch which adds the possibility to give an optional week of year. 2008-08-11 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: !!! Work in progress !!! Project Trees The classic worklog only has one key to address a project. This is major short comming. The getan database allows to store projects keys with more than one character. This feature will be exploited to build trees of projects. Lets say you have two main tasks foo and bar with two sub tasks each you can name them f1, f2 and b1, b2. getan stores these four tasks in a tree with top level f and b and tow second level branches 1 and 2. To choose a task you have to press f or b followed by 1 or 2. At the moment only selection works. TODO and next steps: - Remove all old linear data structures. - adjust rendering to only show active branches. - sort anonymous task after naming into project tree. 2008-08-04 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeiterfassung: Applied a variation of Stephan Holl's zeiterfassung.non-utf8-chars-in-db.patch to force the encoding given by --encoding=. 2008-08-03 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeiterfassung: Added parameter -e | --encoding=. This enables e.g. the output as latin1 with --encoding=latin1. 2008-08-03 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeiterfassung: Applied and completed Stephan Holl's zeiterfassung.bessere-lesbarkeit.patch, fixed small issue with --project= parameter. 2008-08-01 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/zeiterfassung: New. generates lines for zeiterfassung.txt. usage: ./contrib/zeiterfassung <options> with <options> [--user=|-u <user>] : Name of user, default: $USER [--database=|-d <database>]: getan database, default: time.db [--project|-p] : Key of output project, default: all [--list|-l] : list all projects [--help|-h] : This text 2008-07-31 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: Feature wish 8: F1 is like <ESC>-1, F2 is like <ESC>-2 to F10 is like <ESC>-0. 2008-07-31 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: Feature wish 4: in +/- time defaults to minutes. Strings like '1d:4h:3m', or '2m:4s' and so on are valid times now. Feature wish 10: When adding time to project is now possible to enter an optional description. 2008-07-31 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/wochenbericht: Applied patch from Stephan Holl to show usage on '-h' of '--help'. Added check for existence of db file. 2008-07-31 Sascha L. Teichmann <sascha.teichmann@intevation.de> * contrib/wochenbericht: New. Little script to summarize the entries for a given week number of year. 2008-07-30 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: Added total sum of all projects. * README: Added hint to tac your old worklog config file to keep reversed order. 2008-07-30 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: Added +/- time to tasks. If in pause mode press + or - to add or subtract time from a task in form of <key> <seconds>. key is the effected task seconds is the among of time. seconds can be postfixed by 's' for seconds, 'm' for minutes, 'h' for hours and 'd' for days. 2008-07-29 Sascha L. Teichmann <sascha.teichmann@intevation.de> * getan: To exit getan you now can use double BACKSPACE, too. * README: Fixed typo, added hint to Sascha Wilde's projects converter. * contrib/convert-projects: Added Sascha Wilde's converter to import existing worklog configuration files. 2008-07-28 Sascha L. Teichmann <sascha.teichmann@intevation.de> * ChangeLog, LICENSE, README, TODO, getan, schema.sql: Initial import